Mine Rehabilitation & Reclamation

We Turn Liabilities
Back Into Land.

47,200acresReclaimed to Date
94%Bond Release Rate
318sitesCompleted Projects
31statesOperational Footprint
Scroll
01 / Capabilities

Equipment & Permit
Inventory.

Reclaim operates a fully-owned equipment fleet rated for Class I–IV mine disturbance. All work is self-performed — no subcontract exposure on critical path items.

Earthwork capacity
2.1M

Cubic Yards Moved (2024)

Native species establishment
6,400

Acres Seeded (2024)

AML grant recipients
18

Active State Programs

Zero permit violations
100%

SMCRA Compliance Rate

Equipment Class

Class A — Highwall Regrading

D10T/D11T dozers, 150-ton haul trucks, 6060FS draglines. Cuts to 200-ft vertical face. Suitable for SMCRA §515(b)(3) compliance.

Equipment Class

Class B — Tailings Impoundment Closure

Geosynthetic cap installation, leachate collection, HDPE liner systems. EPA CERCLA and RCRA Subtitle C permitted.

Equipment Class

Class C — Drainage Recontouring

Valley fill reconfiguration, APDES permit compliance, sediment pond removal, natural channel design to Rosgen Level III.

Equipment Class

Class D — Revegetation & Seeding

Native grass establishment, woody species transplant, NRCS-approved seed mixes. Productivity bond release documentation.

Permit & Regulatory Coverage

SMCRA Title V

Surface mining permits, bond release Phase I–III

AML Section 402

Abandoned mine land program grants and closeouts

NPDES/APDES

Water discharge monitoring and permit closure

Section 404/401

Wetland mitigation, stream restoration, Army Corps

CERCLA / Superfund

Remedial action completion and EPA sign-off

RCRA Subtitle D/C

Solid waste impoundment closure plans

02 / Bond Release

Phase-by-Phase
Release Record.

SMCRA bond release requires documented performance at three regulatory thresholds. Below is our aggregate release record across 318 completed permits.

$840MAggregate Bond Liability Released
94%First-Review Approval Rate (All Phases)
47,200Total Acres Released Since 2008
I

Contemporaneous Reclamation

Earthwork & Drainage Completion

Bond Released60%
TimelineAvg. 14 months post-disturbance
Release Milestones
  • Final grading to approved contour (±2 ft LIDAR tolerance)
  • Sediment pond removal and drainage course restoration
  • APDES monitoring: 12-month clean discharge record
  • Geotechnical stability certification (factor of safety ≥1.5)
  • OSM/state regulatory inspection and sign-off
Field Note

Phase I accounts for 60% of bond liability. Our average Phase I submittal is approved on first review in 87% of cases.

Aggregate Acreage Released28,400 acres released
II

Vegetation Establishment

Seeding, Monitoring & Productivity Proof

Bond Released25%
TimelineAvg. 28 months post-seeding
Release Milestones
  • Native seed mix installation per NRCS-approved specification
  • Minimum 70% ground cover two growing seasons post-seeding
  • Species diversity count: ≥18 native species per plot
  • Soil productivity equivalence to pre-disturbance baseline
  • Annual photo documentation and biomass sampling
Field Note

We maintain a 97% Phase II approval rate. Seed mix selection is site-specific — no single formula applied across all contracts.

Aggregate Acreage Released11,200 acres released
III

Full Bond Release

Liability Extinguishment & Site Transfer

Bond Released15%
TimelineAvg. 5.2 years total from permit issuance
Release Milestones
  • Five-year post-seeding vegetation monitoring complete
  • Water quality parameters within pre-mining baseline (±10%)
  • Absence of instability, erosion, or off-site discharge
  • Final OSM/state closeout inspection passed
  • Bond exoneration letter issued to permittee
Field Note

Complete bond exoneration eliminates ongoing financial assurance obligations. Our clients have recovered $840M in aggregate bond liability since 2008.

Aggregate Acreage Released7,600 acres fully released
03 / Case Sites

Project Record:
Numbers First.

Three representative sites from our active portfolio. Toggle each aerial to compare pre- and post-reclamation conditions. All metrics are from final regulatory submittals.

Abandoned deep mine complex with exposed highwall and disturbed terrain in Harlan County Kentucky
Before
Underground Mine Collapse & Highwall

"Reclaim's Phase I submittal was the cleanest package we've reviewed in 14 years of regulatory work."

Marcus Tillman, Kentucky AML Program
CS-001Phase III Complete — Bond Exonerated

Harlan County Deep Mine Complex

Harlan County, Kentucky

Disturbed Acreage1,840 ac
Earthwork Volume4.2M cu yd
Seed Mix Species24 native spp.
Bond Released$12.4M
Project Duration4.8 years
Water QualitypH 6.8 (baseline met)
Subsidence Features312 closed
Stream Ft Restored6,200 lf
Mountaintop removal surface mine with valley fill and exposed bench in Boone County West Virginia
Before
Mountaintop Removal / Valley Fill

"The earthwork execution on this job was exceptional — 7.8 million yards in 18 months without a single permit violation."

Jennifer Kowalski, Alpha Natural Resources EHS
CS-002Phase II Complete — Phase III Pending

Elk Run Surface Mine — Boone County

Boone County, West Virginia

Disturbed Acreage2,610 ac
Earthwork Volume7.8M cu yd
Seed Mix Species31 native spp.
Bond Exposure$28.7M
Project Duration3.2 years (ongoing)
Water QualityTDS 180 mg/L (target met)
Valley Fills Closed8 of 8
Ponds Removed14 sediment ponds
Anthracite refuse culm bank with acid mine drainage and bare terrain in Clearfield County Pennsylvania
Before
Anthracite Refuse / Culm Bank Closure

"This site sat forfeit for 40 years. Reclaim turned it over to the county development authority in under three years."

David Osei, Clearfield County Planning Commission
CS-003Phase III Complete — Development-Ready

Clearfield County Legacy AML Tract

Clearfield County, Pennsylvania

Disturbed Acreage420 ac
Culm Removed1.1M cu yd
AMD Treatment3.2M gal/yr
AML Grant$6.8M (PA DCNR)
Project Duration2.9 years
Post-Closure UseLight industrial
pH (post-closure)7.1 (neutral)
Iron Load Reduction94% reduction
04 / Contact

Request a
Site Assessment.

We review every submission within two business days. Site assessments are no-cost and include a preliminary reclamation approach and bond release timeline estimate.

Capability Statement

Download Our Project Portfolio PDF

18-page capability statement: equipment inventory, permit history, project data sheets for 24 completed sites. Used for pre-qualification and state AML grant applications.

Direct Contact

Project Inquiries

(304) 555-1890

Headquarters

1204 Mine Road Suite 3
Charleston, WV 25301

Credentials & Registrations
SAM.gov Registered — CAGE 8XK42
SMCRA Title V Contractor, 18 States
USACE Section 404 Nationwide Permit
EPA CERCLA Remedial Action Contractor
ISO 14001:2015 Environmental Management